Fitting the first new Purlin

The first purlin was relatively easy to fit because we could work off the mezzanine floor below.  We had to remove a lot of stone from the front gable as it was a rectangular purlin, the original purlin had been a smaller square one.

The first purlin is installed in the front gable wall

The first purlin is installed in the front gable wall

The other end of the purlin is positioned inside the first a frame, it rests on a wooden insert which is secured with high tensile steel threaded bar and timber connectors.

The purlin is secured in the first a-frame.

The purlin is secured in the first a-frame.

Because of the distance between both gables was approximately 10m, and thickness of the gable walls was over 0.5 metres, we had to use 2 perlins on each side of the roof each one was 5.5 metres long.    It was harder to fit the purlins at the back of the barn because we were working off scaffolding and we did not have enough of it! Anyway when all the purlins were fitted they almost joined in the right places!

The front and rear purlins almost meet in the correct place. (We forgot to allow for the curvature of the earth!)

The front and rear purlins almost meet in the correct place. (We forgot to allow for the curvature of the earth!)

Tags: , ,

Leave a Reply

Barn Ceiling Dry Lining» Barn Ceiling Dry Lining
Drywall Plasterboard Vaulted Barn Ceiling» Drywall Plasterboard Vaulted Barn Ceiling
Barn Roof Insulation» Barn Roof Insulation
French Letter Box (boite au lettres) Regulations» French Letter Box (boite au lettres) Regulations
» Chimney Testing Day
» Fixing the Roman Tiles on the gable end.
» All 2007 Pics
» Spirtech 200
» OSB Roof Deck
» Fitting purlins and rafters to rear gable
» Removing the last of the old roof
» Angled Queen Posts
» The first A-Frame is completed
» Fixing the front gable
» Roof Truss Template
Tarpaulin Problems» Tarpaulin Problems
mezzanine floor» mezzanine floor
» in the beginning