Archive for November, 2009

French Barn Mains Water Connection

Thursday, November 26th, 2009

The total cost to get the water 4.2 metres from the water main to the front door is 1,069 Euros. Référence contrat: SIAEP GATINE AFFERMAGE EAU TRAVAUX D’EXTENSION, DEPLACEMENT, RENOUVELLEMENT Code Description des travaux et prestations Unité Qté Prix unit. en euros Total HT en euros Tx TVA 1-TERRASSEMENT 1213 Sciage des chaussées exécuté sur [...]